Underground Utilities construction for the Mariemont Sewer

Underground Utilities

Underground Infastructure Mariemont Sewer Village of Mariemont, OH Contract Value: $7,500,000 Completed in 2005 Project included the installation of 3,777 LF of sanitary piping by microtunneling, 2,025 LF of sanitary piping by open cut, and 2,118 LF of 8” piping through 21” sanitary sewers. CSO 12 Sewer Separation Metropolitan Sewer District Contract Value: $6,950,000 Completed […]

Underground Utilities Read More »

Waste Water Treatment Plant Construction in Cincinnati, Ohio, Dayton, Columbus, Northern Kentucky, Lexington, and Indiana

Waste Water Treatment Plants

Waste Water Treatment Facility Projects Lynchburg Wastewater Treatment Plant Village of Lynchburg, OH Contract Value: $526,000 Project included the construction of a new pumping station, fine screen structure, and non-potable water system. Tate Monroe Water Storage Tate Monroe Water Association Contract Value: $2,450,000 Construction included 1 pump house building and a 1 story, above-grade building

Waste Water Treatment Plants Read More »

Greene County Airport Concrete Pavement Project

Concrete Pavements

Concrete Pavements The Kentucky Speedway Kentucky Transportation Cabinet Contract Value: $3,700,000 Completed in 2013 This project included the construction of pedestrian tunnels, storm sewer, and roadway. UPS Paving Expansion United Postal Service Completed in 2017 Contract Value: $2,900,000 Large concrete paving project for the UPS plant on Canal Road in Cincinnati, OH. Additional work included

Concrete Pavements Read More »

Route 4 Ohio Roadway Construction Project

Roadway

Roadway Paul Brown Stadium Road Improvements Turner-Barton Malow Contract Value: $4,300,000 Completed in 2001 This project consisted of replacing Mehring Way and Central Avenue, which surround Paul Brown Football Stadium in Cincinnati, OH Work included concrete pavement, sewers, landscaping, and pavers. Wayne & Wilmington Intersection Improvements City of Dayton Completed in 2011 Contract Value: $2,600,000

Roadway Read More »

Lockington Dam

Dams

Marine Infrastructure Lake White Ohio Dept of Transportation Contract Value: $31,700,000 Completed in 2018 This project involved the major rehab of 1.04 Miles of S.R. 104 running along the top of the Lake White Dam. Work included the reconstruction of highway surface, improved & relocated intersections, replaced a bridge & spillway, and an upgrade of

Dams Read More »

Shawnee Park Marina

Marinas

Marinas & Boat Ramps Shawnee State Park Marina Improvements Ohio Dept of Natural Resources Contract Value: $2,000,000 Completed in 2013 Mobilization, Demolition, Underwater Demolition, Wall Steel Piles, Docks, Gangways & Restroom improvements East Fork Boat Docks Ohio Dept of Natural Resources Completed in 2016 Contract Value: $360,000 Installation of 4 new floating boat docks with

Marinas Read More »

Cincinnati Ohio Structure building and Construction

Structures

Structures Fountain Square Garage & Plaza 3CDC Contract Value: $2,100,000 Completed in 2006 Structural modifications to the existing parking garage and fountain square plaza. Work included a new transformer vault, overbuilt slabs, widening stair/elevator shafts, the widening of a ventilation shaft, and a new ice rink chiller room. In addition Sunesis assembled a new fountain

Structures Read More »

Mackletree Bridge Design Build Indiana, Ohio, and Kentucky

Bridges

Bridges Washington St. Bridge Replacement City of Dayton, OH Contract Value: $7,800,000 Completed in 2006 Sunesis replaced the historic 98 year old seven span bridge extending over the Great Miami River. Work also included a 628’ long seven span box beam bridge with external architectural precast arch beams. Liberty Fairfield Bridge Butler County Engineers Office

Bridges Read More »

Scroll to Top