Wastewater Treatment Plant

Sunesis Construction has vast experience in the construction of new and upgraded wastewater treatment systems.

Wastewater treatment plant construction is a core piece of our company work portfolio. From projects as small as $50,000 to as large as $5.5 million, we have the experience, manpower, equipment and technical knowledge to manage these projects to final completion while keeping our clients’ operations running smoothly.

In both private and public sector work, our ability to build projects of differing size and scope set us above our competitors. Sunesis Construction has the ability to manage your project without the need for multiple subs or suppliers.

Our Waste Water Treatment Work Includes:

View Some Of Our Waste Water Treatment Facility Projects Below:

Lynchburg Wastewater Treatment Plant

Village of Lynchburg, OH

Contract Value: $526,000
Project included the construction of a new pumping station, fine screen structure, and non-potable water system.

Tate Monroe Water Storage

Tate Monroe Water Association

Contract Value: $2,450,000
Construction included 1 pump house building and a 1 story, above-grade building frame made of pre-engineered metal construct 0.5 million grade water storage tank (tank within a tank design).

Mt. Orab Wastewater Treatment Plant Improvements

Village of Mt. Orab, OH

Contract Value: $2,175,000
Installed twin pumping stations and valve vaults at existing facility; constructed new clarifier; relocated sludge pumps; installed belt press and screw conveyor; modified the pumping system; and installed yard piping.

Centerville Wastewater Treatment Plant

Town of Centerville, IN

Contract Value: $2,780,000
Constructed new headworks, sequencing batch reactor, and post aeration tank. Installed new air bubbling systems, air blowers, raw sewage pumps, gas equipment, scales, and a mechanical bar screen.

Polk Run Wastewater Treatment Plant

Metropolitan Sewer District of Cincinnati

Contract Value: $1,482,000
Constructed approximately 1600 linear feet of 12" to 42" sanitary sewer line that runs west along East Kemper, down a creek bank and under the bridge at Loveland-Madeira Rd. The new line also included two connection lines crossing Polk Run & the decommissioning of the existing Polk Run Pump Station.
Wastewater Treatment Plant Construction in Lynchburg, Ohio

Lynchburg Wastewater Treatment Plant

Village of Lynchburg, OH

Value: $526,000

Project included the construction of a new pumping station, fine screen structure, and non-potable water system.

Waste Water Treatment Plant Construction Tate Monroe, Ohio Water Storage

Tate Monroe Water Storage

Tate Monroe Water Association

Value: $2,450,000

Construction included 1 pump house building and a 1 story, above-grade building frame made of pre-engineered metal construct 0.5 million grade water storage tank (tank within a tank design).

Waste Water Treatment Plant Construction in Cincinnati, Ohio, Dayton, Columbus, Northern Kentucky, Lexington, and Indiana

Mt. Orab Wastewater Treatment Plant Improvements

Village of Mt. Orab, OH

Value: $2,175,000

Installed twin pumping stations and valve vaults at existing facility; constructed new clarifier; relocated sludge pumps; installed belt press and screw conveyor; modified the pumping system; and installed yard piping.

Waste Water Treatment Plant Construction in Centerville, Ohio near Dayton, OH

Centerville Wastewater Treatment Plant

Town of Centerville, IN

Value: $2,780,000

Constructed new headworks, sequencing batch reactor, and post aeration tank. Installed new air bubbling systems, air blowers, raw sewage pumps, gas equipment, scales, and a mechanical bar screen.

Waste Water Treatment Plant Construction Polk Run, Ohio Waste Water Treatment

Polk Run Wastewater Treatment Plant

Metropolitan Sewer District of Cincinnati

Value: $1,482,000

Constructed approximately 1600 linear feet of 12″ to 42″ sanitary sewer line that runs west along East Kemper, down a creek bank and under the bridge at Loveland-Madeira Rd. The new line also included two connection lines crossing Polk Run & the decommissioning of the existing Polk Run Pump Station.

Scroll to Top