Waste Water Treatment Facility Projects
Lynchburg Wastewater Treatment Plant
Village of Lynchburg, OH
Contract Value: $526,000
Project included the construction of a new pumping station, fine screen structure, and non-potable water system.
Tate Monroe Water Storage
Tate Monroe Water Association
Contract Value: $2,450,000
Construction included 1 pump house building and a 1 story, above-grade building frame made of pre-engineered metal construct 0.5 million grade water storage tank (tank within a tank design).
Mt. Orab Wastewater Treatment Plant Improvements
Village of Mt. Orab, OH
Contract Value: $2,175,000
Installed twin pumping stations and valve vaults at existing facility; constructed new clarifier; relocated sludge pumps; installed belt press and screw conveyor; modified the pumping system; and installed yard piping.
Centerville Waste Water Treatment Plant
Town of Centerville, IN
Contract Value: $2,780,000
Constructed new headworks, sequencing batch reactor, and post aeration tank. Installed new air bubbling systems, air blowers, raw sewage pumps, gas equipment, scales, and a mechanical bar screen. 
Lynchburg Wastewater Treatment Plant
Village of Lynchburg, OH
Value: $526,000
Project included the construction of a new pumping station, fine screen structure, and non-potable water system.

Tate Monroe Water Storage
Tate Monroe Water Association
Value: $2,450,000
Construction included 1 pump house building and a 1 story, above-grade building frame made of pre-engineered metal construct 0.5 million grade water storage tank (tank within a tank design).

Mt. Orab Wastewater Treatment Plant Improvements
Village of Mt. Orab, OH
Value: $2,175,000
Installed twin pumping stations and valve vaults at existing facility; constructed new clarifier; relocated sludge pumps; installed belt press and screw conveyor; modified the pumping system; and installed yard piping.

Centerville Waste Water Treatment Plant
Town of Centerville, IN
Value: $2,780,000
Constructed new headworks, sequencing batch reactor, and post aeration tank. Installed new air bubbling systems, air blowers, raw sewage pumps, gas equipment, scales, and a mechanical bar screen.