Bridges

Washington St. Bridge Replacement

City of Dayton, OH

Contract Value: $7,800,000
Completed in 2006
Sunesis replaced the historic 98 year old seven span bridge extending over the Great Miami River. Work also included a 628’ long seven span box beam bridge with external architectural precast arch beams.

Liberty Fairfield Bridge

Butler County Engineers Office

Completed in 2010
Contract Value: $10,300,000
Replaced the 98 year old bridge extending over the Great Miami River with a 628’ long seven span box beam bridge with external architectural precast arch beams. Find our more in the news at: https://www.bceo.org/news/nr080225.html

Center Hill Ave. Bridge

City of Cincinnati Department of Transportation & Engineering

Completed in 2013
Contract Value: $3,400,000
Project included the replacement of an existing 150’ reinforced concrete bridge over Mill Creek. with a 150’ two lane two span prestressed concrete I-beam bridge on driven pipe piles.

SR32 & Eastgate Blvd. Reconfiguration

Ohio Department of Transportation

Completed in 2014
Contract Value: $9,039,000
Reconfiguration of the SR 32 Eastgate Blvd interchange. Construction of bridge ramp.

Newport Riverwalk Improvements
(2 Phases)

City of Newport

Completed in 2014 & 2020
Contract Values:$800,000 and $1,100,000
Multi-phase project completed in 2 parts as part of the Newport Riverwalk Renovation Project. Work included a new sidewalk running on top of the levee from the I-471 bridge to the Purple People Bridge, the setting of 2 new pedestrian bridges, structural stairs and a retaining wall in the plaza.

Historic Sharon Woods Stone Bridge Renovation

Ohio Dept of Natural Resources

Completed in 2004
Project entailed the restoration of an approximately 85 year old historic stone bridge located in Sharon Woods State Park, OH. Rehabilitation included the staged removal of the concrete deck, repairs to the existing concrete beams, a new concrete deck, new concrete approach slabs, and the removal and relaying of the original stone railings.

Grant County, KY Bridge

Kentucky Transportation Cabinet

Completed in 2020
Value: $2,200,000
Job required the removal and replacement of the existing structure on Blanchet Road over active railroad tracks. Project also included waterline work and associated roadway repairs.

Oxford Area Trails Pedestrian Bridges

City of Oxford

Completed in 2020
Value: $2,350,000
Installed a new pedestrian walking trail through a wooded area in Oxford, Ohio. Project scope included the setting of 2 steel pedestrian bridges, a paved walking trail, and installation of retaining walls and fencing.
Washington Street Bridge Construction Project in Dayton, Ohio

Washington St. Bridge Replacement

City of Dayton, OH

Value: $7,800,000

Completed in 2006
Sunesis replaced the historic 98 year old seven span bridge extending over the Great Miami River. Work also included a 628’ long seven span box beam bridge with external architectural precast arch beams.

Liberty Fairfield Bridge

Liberty Fairfield Bridge

Butler County Engineers Office

Value: $10,300,000

Completed in 2010
Replaced the 98 year old bridge extending over the Great Miami River with a 628’ long seven span box beam bridge with external architectural precast arch beams.
IN THE NEWS:   https://www.bceo.org/news/nr080225.html

Center Hill Bridge over Mill Creek

Center Hill Ave. Bridge

City of Cincinnati Department of Transportation & Engineering

Value: $3,400,000

Completed in 2013
Project included the replacement of an existing 150’ reinforced concrete bridge over Mill Creek. with a 150’  two lane two span prestressed concrete I-beam bridge on driven pipe piles. 

Eastgate Blvd US 32 in Cincinnati, OH Bridge Construction

SR32 & Eastgate Blvd. Reconfiguration 

Ohio Department of Transportation

Value: $9,039,000

Completed in 2014
Reconfiguration of the SR 32 Eastgate Blvd interchange. Construction of bridge ramp.

Newport Riverwalk Pedestrian Bridge

Newport Riverwalk Improvements (2 Phases)

City of Newport

Value: $800,000 and $1,100,000

Completed in 2014 & 2020
Multi-phase project completed in 2 parts as part of the Newport Riverwalk Renovation Project. Work included a new sidewalk running on top of the levee from the I-471 bridge to the Purple People Bridge, the setting of 2 new pedestrian bridges, structural stairs and a retaining wall in the plaza.

Sharon Woods Bridge

Historic Sharon Woods Stone Bridge Renovation

Ohio Dept of Natural Resources

Completed in 2004
Project entailed the restoration of an approximately 85 year old historic stone bridge located in Sharon Woods State Park, OH. Rehabilitation included the staged removal of the concrete deck, repairs to the existing concrete beams, a new concrete deck, new concrete approach slabs, and the removal and relaying of the original stone railings.

Grant County Bridge

Grant County, KY Bridge

Kentucky Transportation Cabinet

Value: $2,200,000

Completed in 2020
Job required the removal and replacement of the existing structure on Blanchet Road over active railroad tracks. Project also included waterline work and associated roadway repairs. 

Oxford Pedestrian Bridge in Oxford, Ohio

Oxford Area Trails Pedestrian Bridges

City of Oxford

Value: $2,350,000

Completed in 2020
Installed a new pedestrian walking trail through a wooded area in Oxford, Ohio. Project scope included the setting of 2 steel pedestrian bridges, a paved walking trail, and installation of retaining walls and fencing.

More Projects
Scroll to Top